Bidding on a German public software tender as a small foreign vendor: self-declarations, comparable certificates and the question round

November 16, 2026

What German law lets a buyer ask of a small foreign software bidder, read against two live TED notices from October 2026: the EUR 216,000 and EUR 140,000 thresholds, the 2x turnover cap, three-year references, which papers can be fixed after the deadline, the equivalence rule for certificates and the 6-day question deadline.

A person signing a document at a table across from a man at a laptop

A German city, a county or a state agency publishes a software tender on TED. You are a team of three in another country, and you could do the job. Then you open the tender documents and find a handful of forms in German: a self-declaration on suitability, a reference sheet, a staffing statement, a tax clearance and a list of subcontractors. This is the part that decides whether anyone ever reads your offer. Below is what German law lets the buyer ask for, what it does not let them ask for, and what two real notices from October 2026 asked of bidders.

I read the procurement ordinance (VgV) on gesetze-im-internet.de and pulled two live notices through the TED search API. Everything below comes from those sources and the EU threshold regulation. It is not legal advice, and the notices are examples, not a rule: every buyer sets its own list within the limits of the law.

The short version

- Above the EU threshold, the VgV applies. For 2026 and 2027 the thresholds are EUR 216,000 for supplies and services bought by sub-central buyers (cities, counties, most agencies) and EUR 140,000 for central government. They apply from 1 January 2026 (Commission Delegated Regulation (EU) 2025/2152). Below them, lighter national rules apply.

- Suitability is checked in a fixed order: can the company do the job (section 122 GWB), is it excluded for something it did (sections 123 and 124 GWB), and has it cleaned up since (section 125 GWB). Buyers must take small and young companies into account when they set the criteria, and they do not have to explain why (section 42(2) VgV).

- A minimum turnover may not exceed twice the contract value unless the subject carries special risks and the buyer writes down why (section 45(2) VgV). Turnover evidence covers at most the last three financial years.

- References cover the last three years (section 46 VgV). The buyer may also look at older ones if that is needed to get enough competition.

- You can start with a self-declaration. Before awarding, the buyer must ask the intended winner for the real documents (section 50(2) VgV). Some buyers still ask for parts of them with the offer, so read the notice.

- Missing papers can often be requested after the deadline (section 56 VgV), unless the buyer said in the notice that it will not. Papers that feed the scoring cannot be fixed later.

- Questions have a date. If you ask in time and the answer is not out at least 6 days before the offer deadline, the buyer must extend the deadline (section 20(3) VgV).

Which rulebook, by contract size

The first number to check is whether the VgV applies at all. A software contract is a service contract, so these are the service lines:

text
Buyer type                           EU threshold 2026-2027   Below it
-----------------------------------  -----------------------  ------------------------------
Central government (the State)       EUR 140,000              national sub-threshold rules
Sub-central (city, county, agency)   EUR 216,000              national sub-threshold rules
Social and other Annex XIV services  EUR 750,000              (unchanged)

Value counted: the estimated total over the whole term, net of VAT, options included.
Source: Delegated Regulation (EU) 2025/2152, in force 1 January 2026.

A common mistake is to read the yearly fee. A 3-year support contract at EUR 80,000 a year is a EUR 240,000 contract for threshold purposes, so a city must publish it Europe-wide. TED shows each notice's title in every EU language, but the documents are usually German only, and the first notice below lists German as its submission language.

One real notice, line by line

TED notice 680978-2026: the Kreis Gütersloh buys an HR suite ("16394 Einführung einer HR-Suite für den Kreis Gütersloh"). Open procedure, services, published 2 October 2026, offers due 2 November 2026, German as the submission language. That is a 31-day window. Section 15 VgV sets 35 days for an open procedure and lets the buyer cut 5 days when offers are sent electronically, so 30 is the floor here and 31 fits.

What the notice asks of bidders, translated from its German text:

text
With the offer (also for subcontractors, if any; forms are in the tender documents):
  - Self-declaration for companies that are not pre-qualified

On request (the buyer recommends sending these with the offer to save time):
  - 3 reference proofs, with the minimum details listed on the "Eigenerklärung zur Eignung" form
  - Staff numbers for the last 3 years
  - Entry in the professional register (if applicable)
  - Tax clearance certificates, or a statement in tax matters

Declarations inside the "Eigenerklärung zur Eignung" form:
  - No serious misconduct that puts reliability in question
  - No insolvency proceedings opened, applied for, or refused for lack of assets
  - Company is not in liquidation
  - Taxes and statutory social contributions are paid

Read as a foreign vendor, line by line. The right-hand column is my reading of what to send, not the buyer's text:

text
Asked for                     Where it sits in the VgV        What a foreign small vendor sends
----------------------------  ------------------------------  ----------------------------------------
Self-declaration (non-pre-    Section 50 (EEE) or the         Signed form; ask whether the EEE is
qualified)                    buyer's own form                accepted instead
3 references                  Section 46(1): last 3 years,    3 projects since Nov 2023 with value,
                              value, date, client             date and client contact
Staff, last 3 years           Section 46(1) no. 8             Headcount per year; for 3 people, state
                                                              contractors separately
Professional register         Section 44 (ability to          Extract from your home commercial
                              practise)                       register, translated if asked
Tax clearance                 Buyer's document list           Home tax authority's certificate of no
                                                              arrears; ask how it must be certified
Insolvency, liquidation,      Sections 123 and 124 GWB        Signed declaration; true, or you cannot
misconduct                    (exclusion grounds)             sign it

Two things are missing from this notice, and that tells you something. It asks for no annual turnover floor, no insurance sum and no quality or security certificate. The buyer chose a light list. Another notice from the same weeks shows how much the lists vary.

The same weeks, a heavier list

TED notice 683904-2026: the north German broadcaster NDR buys maintenance and operation of a BI system, also an open procedure, offers due 3 November 2026, one day after the first. TED lists four selection criteria for it: entry in a professional or trade register, technical and professional capacity, company information, and proof of insurance with a minimum sum. It also marks a financial guarantee as required. The notice text only gives these as headings; the amounts sit in the tender documents.

The lesson: the notice is a summary and the tender documents hold the numbers. Download them (many platforms let you do that without registering) before you decide to bid.

What the buyer may demand, and where the law stops it

text
Topic              Rule                                              Section
-----------------  ------------------------------------------------  --------------
Minimum turnover   May be set; above 2x the estimated contract       VgV 45(1),(2)
                   value only with written reasons
Turnover proof     At most the last 3 financial years, and only      VgV 45(4)
                   where the data exist
Young company      If you cannot give the documents, other           VgV 45(5)
                   suitable proof is allowed; a young company is
                   the named example
Insurance          Professional liability of a suitable amount       VgV 45(1)
References         Last 3 years; older ones may be considered if     VgV 46(1)
                   needed for competition
Small firms        Buyer must take SMEs and young firms into         VgV 42(2)
                   account, no justification needed

Worked example. A buyer estimates a contract at EUR 300,000 over 3 years. The highest minimum turnover it can ask for without written special reasons is EUR 600,000. A team of three with a turnover of EUR 400,000 fails a floor set at that cap. It passes a floor of EUR 300,000 (the contract value). And if the team is young and cannot show three years of accounts, section 45(5) lets it prove capacity another way the buyer finds suitable.

text
Estimated contract value   Highest turnover floor without a written reason (2x)
-------------------------  ----------------------------------------------------
EUR 100,000                EUR 200,000
EUR 300,000                EUR 600,000
EUR 1,000,000              EUR 2,000,000
EUR 5,000,000              EUR 10,000,000

A floor above that line is a good reason to send a question, which brings us to the question round.

Borrowing capacity from a partner

Section 47 VgV lets you rely on another company for financial, technical or professional capacity if you prove you can use its resources, for example with a commitment letter from it. Limits to know:

- For professional proof such as training or experience, the partner must actually do the part of the work that the proof is for. A larger partner's reference does not carry your offer if you do all the coding.

- The buyer checks the partner too. If the partner fails a criterion or has a mandatory exclusion ground (section 123 GWB), you must replace it.

- For financial capacity the buyer may require you and the partner to be jointly liable, to the extent of the capacity lent.

- The buyer may also require that certain critical tasks are done by the bidder itself or by a member of a bidding consortium.

For three people, a bidding consortium with a local firm is the usual way to meet a reference or turnover floor. Put the split of tasks in writing before you ask the buyer a single question.

"Or comparable": what the law says about certificates

Software tenders sometimes ask for a quality or security certificate, such as ISO 9001 or ISO 27001. Section 49 VgV covers equivalence for quality assurance and environmental management:

- The buyer must accept equivalent certificates from accredited bodies in other countries.

- If you could not get the certificate in time for reasons that are not your fault, the buyer must accept other proof of equivalent measures. You carry the burden of showing they are equivalent.

- The section covers quality and environmental systems. It does not name information security certificates; for those the buyer's own wording in the documents controls. Ask.

So an ISO 9001 certificate from an accredited body in another country counts. "We follow the same practices, we just have no paper" is accepted only in the narrow case of a delay that was not your fault. For the security side, our articles on ISO 27001 or SOC 2 for European customers and BSI C5 show what each costs and who may issue it.

The question round, with dates

Section 20(3) VgV: if a company asked for more information in time and the buyer did not provide it at least 6 days before the offer deadline, the buyer must extend the deadline in proportion. The same applies if the tender documents change in a material way. There is no extension if the information does not matter for the offer or was not requested in time. The VgV text gives no number for "in time"; buyers write a question deadline into the documents, so read that first.

text
Notice 680978-2026 (dates from TED)
   2 Oct 2026   Notice published
  27 Oct 2026   Last day for answers before the buyer must extend (2 Nov minus 6 days)
   2 Nov 2026   Offer deadline

Your own plan, counted back from the offer deadline:
  Day -31   Notice out: download the documents, list every form
  Day -28   Send questions on the unclear lines (the buyer's own date may be earlier)
  Day -6    Answers due, or the deadline moves
  Day -5    Freeze the documents; sign the declarations
  Day 0     Offer uploaded on the buyer's platform

Questions that change a bid, with the VgV reason behind each:

- "Which of the listed documents are needed with the offer, and which only from the intended winner?" (section 50(2).)

- "Will missing documents be requested after the deadline, or are such offers excluded?" (section 56(2): the buyer may state in the notice that it will not request them.)

- "Is the EEE accepted instead of the self-declaration form, and may a home-country register extract replace the German professional register?" (section 50(1) and the buyer's own list.)

- "Do you accept an equivalent certificate from an accredited body in another state?" (section 49.)

- "What is the basis of the turnover floor, and is it above twice the estimated value?" (section 45(2): then the reasons must be in the documents.)

- "In which language may the offer and the references be written?" (the first notice lists German only.)

Your questions and the answers go to all bidders, so do not put your pricing idea or your product's weak points in a question.

Missing papers: what can be fixed after the deadline

text
Allowed (section 56)                       Not allowed (section 56(3))
-----------------------------------------  ----------------------------------------------
Request missing documents                  Missing papers that feed the scoring of the
Complete, explain or correct incomplete    offer (performance concept, quality proof)
or faulty documents                        Price changes, except minor items that do not
Calendar-dated, reasonable deadline        change the total or the ranking
The buyer logs the decision                Anything, if the notice said it will not ask

Practical effect: a missing reference sheet is usually fixable. A missing technical concept is not. Put the scored material in first and complete.

How many get through

In every procedure except the open one, the buyer may shortlist. Under section 51 VgV it must state its criteria and the intended minimum in the notice, and the minimum may not be below 3, or below 5 in a restricted procedure. If the buyer limits the field to 5 and ten suitable firms apply, the stated ranking criteria decide, which is often the references. In an open procedure every suitable bidder is in.

A checklist for a three-person foreign vendor

text
[ ] Estimated value above EUR 216,000 (or EUR 140,000 for the State)? Note the procedure type
[ ] Download the tender documents; list every form and which are due with the offer
[ ] Read the question deadline and the offer deadline; put both in the calendar
[ ] 3 references from the last 3 years, with value, date and a contact who will answer
[ ] Headcount for each of the last 3 years
[ ] Home commercial register extract; tax clearance from the home tax office
[ ] Insurance certificate for the sum asked, or a broker's quote in writing
[ ] Signed declarations: misconduct, insolvency, liquidation, taxes and social contributions
[ ] Partner or consortium letter if a floor needs it (section 47)
[ ] Certificate: accredited-body equivalent in hand, or a written question sent
[ ] Offer in the buyer's language, uploaded on the buyer's platform before the deadline

What I could not check: the full tender documents of the two notices (TED gives the selection text and lot data only), each buyer's question deadline, and the German sub-threshold rules (the UVgO, which is being revised). If you plan to bid, have a procurement lawyer or a local partner read the documents once; that read costs little next to a wrong declaration.

A German buyer reads your security answers before it reads your price. Score your product against the 25 Minimum Viable Secure Product controls and see the gaps they will find first.

Open the security baseline self-assessment

Sources

Section 45 VgV, economic and financial capacity; section 46 VgV, technical and professional capacity; section 47 VgV, borrowed capacity; section 49 VgV, quality and environmental proof; section 50 VgV, the EEE; section 51 VgV, limiting candidates; section 56 VgV, missing documents; section 15 VgV, deadlines; section 20 VgV, extension of deadlines; section 42 VgV, suitability check (all read 16 November 2026).

TED notice 680978-2026, Kreis Gütersloh and TED notice 683904-2026, Norddeutscher Rundfunk, selection criteria read through the TED search API on 16 November 2026; Commission Delegated Regulation (EU) 2025/2152 (thresholds, figures as summarised by Cuatrecasas); Public Buyers Community note on the 2026-2027 thresholds.